SH2 Pekatahi Bridge overnight closures for maintenance

NZ Transport Agency Waka Kotahi | 16 Nov 2026 6:15pm | Bay of Plenty

Pekatahi Bridge on State Highway 2 (SH2) near Tāneatua will close over 3 nights from Sunday 22 November so crews can complete essential bridge maintenance. 

The bridge will be closed to all traffic each night from 8:00pm and reopened at 6:00am. 

The work involves tightening clamps under the bridge deck to help maintain the integrity and reduce wear and tear on the timber beams. 

Crews have already completed clamp tightening where they can safely access the bridge from land. The next stage will be completed above the river, where crews will use a specialist bridge maintenance machine that can reach the side of the bridge from the riverbank. For safety, this work cannot be carried out while traffic is using the bridge. 

NZ Transport Agency Waka Kotahi (NZTA) Bay of Plenty Area Manager Sandra King says the overnight closures are needed to complete the work safely and efficiently. 

“We know any closure of Pekatahi Bridge is disruptive, and we plan these works carefully to reduce impacts as much as we can,” Ms King says. “This work is about keeping the existing one-lane bridge safe and serviceable while planning and design continues for the new 2-lane replacement bridge. 

“Some of the bridge deck clamps are above the river, so crews need specialist equipment and a clear work area to reach them safely. Closing the bridge overnight is the safest and most practical way to complete this work.” 

During the closures, all traffic will detour via Tāneatua Road, Valley Road, Arawa Road, Hinemoa Street and SH30 through Awakeri. Freight vehicles and interregional road users will also need to use this detour. All road users should plan ahead and allow up to 20 minutes extra travel time.  

Whakatāne District Council will also be carrying out works on Tāneatua Road during this time; however, this work will not affect people using the detour route. 

Nearby residents may notice work activity, lights and traffic management during the night works. Crews will aim to complete the work as efficiently as possible. 

NZTA thanks local communities, nearby residents, businesses, freight operators and road users for their patience while this important maintenance is completed. People should check the NZTA Journey Planner before travelling for up-to-date information on road conditions and closure times. 

Note: 

Planning for the new bridge continues. Earlier this month we lodged consent applications for the project. 

We expect to be construction-ready by mid-2027. Starting work remains subject to funding approval through the 2027–30 National Land Transport Programme.